Customer: OJSC «TGC-6»Contract’s subject: Reconstruction of the CHP with installation of two CCGT units 185 MW each, including delivery of auxiliary materials, construction, erection, startup works, participation in commissioning of the facility.Sector: Heat power industryTerritory: Kstovo, Nizhny Novgorod region, RussiaImplementation period: 2012 - 2014More
-
Customer: OJSC «FSK UES»Contract’s subject: Turnkey reconstruction of the SS 500 kVSector: Electric power industryTerritory: Demianskoe village, Uvatsky area, Tyumen region, RussiaImplementation period: 2010 - 2014More
-
Customer: OJSC “FSK UES”Contract’s subject: Turnkey construction of the SS “Voskhod” 500 kV with overhead line entries 110 and 220 kVSector: Electric power industryTerritory: Kormilovsky area, Omsk region, RussiaImplementation period: 2010 - 2012More
-
Customer: OJSC«FSK UES»Contract’s subject: Turnkey construction of the overhead line 500 kVSector: Electric power industryTerritory: Sverdlovsk region, Perm Territory, RussiaImplementation period: 2008 - 2011More
-
Customer: OJSC «FSK UES»Contract’s subject: Turnkey construction of the SS 110 kV with cable line entriesSector: Electric power industryTerritory: Krasnaya Poliana, Krasnodar Territory, RussiaImplementation period: 2010 - 2011More
-
Customer: OJSC «FSK UES»Contract’s subject: Turnkey reconstruction of the SS 220 kVSector: Electric power industryTerritory: Krasnodar Territory, RussiaImplementation period: 2008 - 2011More
-
Customer: OJSC «INTER RAO UES»Contract’s subject: Turnkey construction of the Unit Gas Conditioning Station for the CCGT 450 MW to the CHP-2Sector: Heat power industryTerritory: Kaliningrad region, RussiaImplementation period: 2009 - 2010More
-
Customer: OJSC “FSK UES”Contract’s subject: Turnkey construction of the SS 220 kV with aerial cable line entriesSector: Electric power industryTerritory: Skolkovo, Moscow region, RussiaImplementation period: 2011 - 2012More
-
Customer: OJSC “FSK UES”Contract’s subject: Construction of the SS “Krasnoarmeyskaya” 500/220/35 kV with overhead line entries 500 and 220 kVSector: Electric power industryTerritory: Krasnoarmeysky village, Samara region, RussiaImplementation period: 2008 - 2010More
-
Customer: OJSC “FSK UES”Contract’s subject: Turnkey construction of the overhead line 500 kVSector: Electric power industryTerritory: Khanty-Mansiisk autonomous district, RussiaImplementation period: 2008 - 2011More
-
Customer: “GSR Energo”Contract’s subject: Turnkey construction of the first power unit of the CCGT 110 MW within the framework of the project of expansion of the existing CHP with construction of two power unitsSector: Heat power industryTerritory: St-Petersburg, RussiaImplementation period: 2010 - 2013More
-
Customer: OJSC “FSK UES”Contract’s subject: Turnkey construction of the SS 500 kVSector: Electric power industryTerritory: Peresvet village, Surgut region, Tyumen areaImplementation period: 2007 - 2010More
-
Customer: OJSC «FSK UES»Contract’s subject: Turnkey construction of the overhead line 500 kVSector: Electric power industryTerritory: Rostov-on-Don, RussiaImplementation period: 2010 - 2013More
-
Customer: OJSC «FSK UES»Contract’s subject: Turnkey construction of the SS 500/330/220/10 kVSector: Electric power industryTerritory: Rostov-on-Don, RussiaImplementation period: 2007 - 2011More
-
Customer: OJSC «TGC-9»Contract’s subject: Fulfillment of the project of all the power infrastructure within the limits of the site, the construction part of the main building.Sector: Heat power industryTerritory: Perm Territory, RussiaImplementation period: 2009 - 2012More
-
Customer: Novolipetsk SteelContract’s subject: Construction of a blast-furnace gas recovery power plant with 150 MW installed power for the needs of the Novolipetsk SteelSector: Heat power industryTerritory: Lipetsk region, RussiaImplementation period: 2008 - 2012More
Сurrent:
Design and survey work on the construction of the Federal Testing Center in St. Petersburg
Implementation of a complex commissioning of two units of equipment STATCOM on SS 220 kV
Complex of works on replacement of air circuit breakers 500 kV
The completion of the 440 MW CCGT CHP Zatonskaya in consortium with "Cascade-Energo" (Group of companies "Tashir")
Expansion of the Diagilevskaya CHP by construction of a CCGT unit with 115 MW power
Expansion of the Diagilevskaya CHP by construction of a CCGT unit with 115 MW power
Completed:
Design and construction of 10 kV cable line from Substation Poselkovaya to the resort and tourist complex "Mountain Carousel" and ski jumping complex...
Installation of the second autotransformer 220/110 kV
Reconstruction of bay No. 4 of the open switchgear 500 kV, including design, delivery of equipment, construction, erection and startup works
Development of design estimates for the construction of coal-water boiler house heat capacity of 30 Gcal / h
Development of design estimates for the construction of coal-water boiler house heat capacity of 37 Gcal / h
Installation of technological pipelines on NPP-2