RECONSTRUCTION OF THE SS «DEMIANSKAYA» 500 KV

Customer: OJSC «FSK UES»

Contract’s subject: turnkey reconstruction of the SS 500 kV

Industry: Electric-power industry

Territory: Demianskoe village, Uvatsky area, Tyumen region, Russia

Company, responsible for the implementation of the project:
CJSC «Engineering – Construction Company «Soyuz- Grid»

The CJSC «Engineering – Construction Company «Soyuz- Grid» is a general contractor, specializing in turnkey construction of power grid facilities (EPC/EPCM).

Details

PROJECT’S DESCRIPTION

Detailed design, delivery of main technical equipment 500-6 kV, construction, erection and startup works on reconstruction of the existing outdoor switchgear 110 kV of the SS “Demianskaya” and construction of a new substation 500/220/110  kV at the site near the SS «Nelym» with organizing communication between them through the overhead line110 kV. The completion of all the works is planned for October, 2014. The substation «Demianskaya» 500 kV with transformer capacity 1252 MVA was put into operation in 1969. It provides power supply for the nearest inhabited localities. Among the important industrial consumers of the substation is the OJSC “TNK-BP”.